1 |
This is a test tender for Falta SEZ dataed 31.12.2019 |
|
[1 MB] |
2 |
E Tender for Advertisement |
|
[1 MB] |
3 |
Corrigendum |
|
[459 KB] |
4 |
Corrigendum 2 |
|
[308 KB] |
5 |
Notice inviting Tender(NIT) for Maintenance of Falta Zone |
|
[115 KB] |
6 |
Notice inviting Tender(NIT) for Maintenance of Falta Zone |
|
[113 KB] |
7 |
Notice inviting Tender(NIT) for Maintenance of Falta Zone |
|
[113 KB] |
8 |
Notice inviting Tender(NIT) for Maintenance of Falta Zone |
|
[117 KB] |
9 |
EOI Access Control |
|
[541 KB] |
10 |
Construction of Iron Fencing Post and Brickwork at Falta SEZ, Sec-I, (Gate no. 1) 24 Pgs(S) |
|
[618 KB] |
11 |
Repairing and Maintenance Work (Civil & Electrical) of Pump House and Transformer Room No. 1 at Falta SEZ, Sec-I, South 24 Pgs |
|
[828 KB] |
12 |
(A)Construction of Concrete Road at Front Side of M/s. SAI Industries Ltd. Sec-I, Falta SEZ (FSEZ), Falta, WB. (B) Fitting and Fixing of Barbed Wire & Concertina Coil from Customs Gate (No-1) to CCT |
|
[958 KB] |
13 |
Supply, Erection, Fitting and Fixing of one 16 m. High Mast Flood Light at Rotary No. 4 (Near KKalpana industries) at Falta SEZ, Sec-I, 24 Pgs. (S) |
|
[798 KB] |
14 |
EOI Jetty |
|
[498 KB] |
15 |
Corrigendum EOI Jetty |
|
[367 KB] |
16 |
Repairing and Painting of Fire Fighting Pipe Line and Construction of Concrete Footpath from existing Road to Fire Hydrant at Falta SEZ, Sec-II 24 pgs (s) |
|
[625 KB] |
17 |
Repairing and Painting of Fire Fighting Pipe Line and Construction of Concrete Footpath from existing Road to Fire Hydrant at Falta SEZ Sec-I, 24 pgs (s) |
|
[623 KB] |
18 |
Meter Room, Tender No. FSEZA/R&M/E-Tender/2022/53 |
|
[123 KB] |
19 |
Repairing (Plaster and Paint) of Boundary Wall back side of M/s. CCT, Sec - I, Falta SEZ |
|
[740 KB] |
20 |
Construction of Plinth Protection |
|
[820 KB] |
21 |
Supply fitting and fixing of 60 W Led Light, arm bracket, Pole clamp, angel on RCC pole at various location of Sector-I Falta SEZ |
|
[592 KB] |
22 |
Repairing (Plaster and Paint) of Boundary wall both side from Customs Gate to Old Customs Gate, Sec-I, Falta SEZ |
|
[764 KB] |
23 |
Construction of Plinth Protection of (Fire Pump House No 1) Ground Water Reservoir and Reservoir Surrounding Boundary Wall Repairing at Falta SEZ Sec-I, 24 pgs (s) |
|
[604 KB] |
24 |
Repairing (Plaster and Paint) of Boundary Wall both side near Fire Pump House No.1 at Falta SEZ, Sec-I, 24 Pgs (s) |
|
[594 KB] |
25 |
Supply, Erection and Repairing of 9 m. Street light pole with 120 w LED Light from Custom gate to master bagan at Falta SEZ, 24 pgs (s) |
|
[613 KB] |
26 |
Supply fitting and fixing of 60 W Led Light, arm bracket, Pole clamp, angel on RCC Pole at various location of Falta SEZ, Sec-I , 24 pgs(s) |
|
[592 KB] |
27 |
Supply Erection, Fitting and Fixing of one 16 m. High mast Flood Light in front of Custom Gate at Falta SEZ, Sec-I, 24 pgs (s) |
|
[640 KB] |
28 |
Tender Drain Cleaning |
21-07-2022 |
[285 KB] |
29 |
Engagement of Chattered Accountant Firm for FSEZ Authority |
05-12-2022 |
[376 KB] |